Finishing Quality Control SOP Procedure

 

Finishing Quality Control SOP Procedure



 
 
Purpose & Scope

Finishing is the last step of the apparel industry. Quality Control is necessary for every stage of garments production for the purpose of making a quality product, finishing the garments, prepare for shipment and finally deliver to the garments buyer. So, finishing is a very important process in garments. To ensure finishing quality control by the garments manufacturer a finishing quality control SOP of Factory, and should be followed accordingly.

  • Responsibilities
  • Head of Production
  • Head of Quality
  • Manager Quality
  • Manager Production 

Procedure

Finishing Quality Control.

  • All Sewing Garments is to receive into finishing section after washing (if GMTS need finishing as per buyer’s requirement).
  • Washed garments to be checked for shade acceptance in a standard light box as per buyer approved all shade standard. If a lot fails in AQL to meet shade acceptance, then GMTS will send back to washing for rewash.
  • After passing shade of Garments and thread trimming, quality checking starts as per style wise process sequence but must maintain size wise bundle.
  • Excessive WIP (Work in Process) and dumping more than one bundle stacking in one layer is not allowed in any operation of finishing.
  • Any defective garments will not pass from any operation without alteration and QC pass.
  • Pull test as per customer requirement
  • 100% Garments quality inspection and thread trimming
  • 100% Garments key point measurement
  • 100% pressing as per customer requirement
  • Quality audit is to be done before moving garments to pack
  • Specific written instruction for every operation with garments form mockup as visual instruction for ironing, attaching the sticker, measurement, quality inspection, folding and packing.
  • Approve trim card for every style with all finishing trims and accessories.
  • 100 % garments metal detection is to follow to ensure garments free from a needle, sharp tools and any types of metal as ensured product quality.
  • Packing of garments as per customer Stock Keeping Unit (SKU) and assortment requirement.

 

Ironing (Pressing) Standard Operating Procedure (SOP)

  1. Garments come in iron table size wise by the bundle.
  2. Only one size is allowed in a bundle.
  3. Iron table marking before every style starting.
  4. A carton in every iron table to keep defects and marking with arrow sticker to detect defects.
  5. Out of tolerance Garments not be passed from measurement section, the Iron show having every measurement table.
  6. Every Gate up Quality inspector having measurement tape and style wise measurement sheet.
  7. Approved sample hanging with written instruction in Iron, Quality Inspection, and packing area.
  8. From Iron garments moving bundle wise up to packing.
  9. Garments not are gathered by more than one style or color in every iron and quality inspection table.

Finishing Quality Audit

Finishing AQL Auditors audit GMTS before moving GMTS to packing area from every bundle using AQL 2.5. If audit pass, GMTS will move forward for packing. If Audit fails, an auditor will give back GMTS to Quality checkpoint area to recheck. After completing recheck, AQL Auditor will re-audit. An auditor audits full PO lot as per buyer final audit sampling policy when that PO is already 80% packed to check packed GMTS quality before a final audit. If Pre-final audit fails, then full PO will be rechecked.

Related Documents

v  Finishing department all quality report.

v  Styling check report.

v  Measurement check report

v  Workmanship / Quality check report

v  Test Report

v  Audit Report


 